• To appoint and work with the project team (designers, Engineers and Consultants), to determine the initial pre-construction design costs and potential construction cost as a result of that design.
  • To consider construction design, methodology, suppliers and materials alternatives and evaluate them for cost including build-ability considerations and report.
  • Work in with the clients to develop a more accurate and detailed cost plan.
  • Work with the project team through to building consent approval.